Steiner list from 7/12/04.

Machine boxes for ANSS Year3 Hardware.

Finish shake tables

design new b/o for bb sensor

machine and install handles

fdl flood prevention

neutralize etchant

install sensor on washtank

pour vault slabs

cmg-6 gps antenna design aond const.

new cmg-6 suppressors

worm rack doors

precision power for perc drums

gps comp system case mgf

test downhole bb sensor

install vault wiring

install hands on dm-24

marked tree roof re-do

cmg-6 batteries

ITS prep


Steiner's old list from 5/24/04

Steiner's old list from 6/2/02