The top priority is always repair of down stations.
NM problem stations
ET problem stations
The Chili Cookoff and Holiday party will be combined on Dec 9. Jim Bollwerk remains the undefeated champion.
Mitch submitted the NM analog sp upgrade plan to USGS.
Bob D. mentioned he recently purchased a 4G LTE wireless plan that seems to work well. It's $25/mo allegedley for 10 years.
2022 DM: SLU O&M, SFTN power, and 4 remaining AG upgrades. Includes funding to purchase Nanometrics hardware just like the first set of 5 stations in 2021 DM. AG hardware is on order and should arrive mid-December, now arriving Feb or March; waiting on cables.
We would like to have a photo of each station in SIS. Make this part of the documentation process after each station visit.
Year 4 renewal is submitted. Budget for the year beginning 2/1/23.
Discussion on the ABB channels. We now have 12 NM sp digital stations contributing to automatic locations. The new postgres AQMS system has trouble with non-standard seed channel names (specifically, the waveform_gifs in the DRP). Should we just close those channels? Yes, though we still need mudworm to digitize EBZ and SFTN. EBZ can be closed but SFTN can not. Need to coordinate with Holly and decide when to turn off the ABB--we should likely have a few more digital stations first.
Lost power during the Christmas outage for about 5 hours and the new generator carried the load. All loads except 3904 emergency lights and outlets are now on the new generator (e.g the room lights for 218). Unfortutnately the old generator failed to start due to a batter/cable problem. Dave fixed that.
HOPT2 needs an antenna upgrade at the node receive. So do PENM and PGVM. Eventually all node 900MHz antennas need an upgrade to allow sharing digital bandwidth. Probably will also need mini-nodes to reduce incoming traffic on a finite number of radios at the nodes.
Bullets used in the DBB are EOL. Replacements are about $80 each. Mitch will figure out which account to use and they can be replaced. The new ones should have better throughput and make better use of frequency hopping. Software, aircontrol, will need to be updated.
Also need a new spectrum analyzer that works at 2.4-5GHz. About $6500. Mitch will figure out which account to use.
We operate 18 cell routers and 6 have been upgraded to FirstNet B14. Therre are still 12 SIMs that need to be upgraded and 5 of those sitets will also need cell router upgrades. CBMO, CGM3, FVM, MCIL, NMKM/RLAP and Starr Mt are done.
WYBT was orphaned by the HOPT2 digital upgrade. James will close the hardware epoch in SIS and leave the station open for now until a final decision is made on the digital network configuration (i.e. when we decide how many and which analog stations are closed).
2021 DM ISIS5 upgrades are complete. Two loose ends remain:
Decommission CWPT.
TMAR, LRAR & MTAR
Note, there are still 3 ISIS2 stations, TMAR, LRAR, and MTAR, and we now have spare ISIS3 canisters. Should they be upgraded or wait until the digital plan is finalized? (recall ISIS2 suffered from the bad ground a the bottom of the canister.)
Replacement batteries are in house for DBB nodes at Wilder, MKTA roof.
MPHB continues to hang; it's an old serial to inernet DM24 system. The sensor hasn't been calibrated in three decades and has been in the borehole for nearly two of them. It is not being archived at IRIS and there is no metadata (Mitch has the original Guralp documentation though it is likely no longer accurate). We discussed whether to turn it off. It doesn't cost anything though isn't useful either. It is a nice borehole in a very noisy location so also not particularly useful from a monitoring perspective. It can be obsolesced as time permits.
WALK needs to move, Dave has a new site selected.
STAM needs to move. Landowner is prepping a new site for us.
HOVM has telemetry interference at the Luxora repeater. No good workaround. Convert it to digital. Done, got Centaur, I5/titan upgrade Oct 2022.
NMDown
Data taken from:
/dat1/seisadm/Working/NM/202301/20230107_044839_MAN
/dat1/seisadm/Working/NM/202301/20230109_050505_MAN
NM
Down
MLDM
MTAR
PPLM
TOPM
TYAR.EHN
WYBT-decommissioning?
Misc Problems
QUAR - spikes
HOPT2-connection issues
AG
Misc Problems
X702.HHN - spikes
QUAR needs a tower.
DBB:
SFTN needs improvements in backup power. Line power is supplied by the no-longer occupied residence owned by the University. We hook in at a circuit box in a nearby shed. Need to add more battery and solar to last up to a week. Funded with 2022 DM. Need to purchase the hardware--the clock is ticking and June is sooner than we think.
MKTA:
LNXT:
Generator is due for a service and load test. Do this in February to put it in the new budget year. We'll do the routine maintenance now and have Cummings do a load bank test later this year. Checked the maintenance records and Cummins made repairs w/load bank test in Sep 2021. Unless there's a problem we were planning on a load bank service every 24 months. 2022 was first year since 2012 we didn't spend $$ on the generator. 2012-2021 total was $29,372.51 or an average of $2,937/year
NMAD:
AZTN/HDBR:
CERI:
YH.WSCT has cell connection problems. Will get the new FN B14 SIM and cell router this week.
MGNC needs more solar and a new antenna.
Need to test the internet at PARI. John ordered media converter for the test.
RCGA needs to move. John found a City Park in Chattannooga that is a former ammo dump. He's trying to get a permission to do a noise study to relocate the station into one of the bunkers. The city is willing to let us use the park internet.
fgtn needs a solar upgrade. Need a crew from Memphis to help. Watch for vandals.
Replacement station for GTTN and RBNC needs a new plan. A cell modem would provide more options.
WSNC will get a new cell modem this week.
WMTN needs a new Geobit.
Five faulty geobits sent to ISTI. Did we get these back?
ETDown
data taken from:
/dat1/seisadm/Working/ET/202301/20230103_151340_MAN
Down
GFM.HH* & GFM.HN*
MGNC-no access to station
DYTN.EHE
LRVA-connection issues
VHTN-connection issues
VHTN.EHE
Misc Problems
ASTN.HN* see image
STAR Node
The Dalton link is dead and we're currently using a cell modem. The cell modem is doing a very good job but we still would prefer to use it as a backup not primary. John got connection info from Dalton and James configured it but we're still not connected. John is working with Dalton to enable the link but it doesn't seem to be a priority for them. Note from Nov 4 to Dec 4 we uised 89 GBs of cell data. Not bad for $40.24/mo but we shouldn't push our luck even if the plan is "unlimited."
GRBT and DYTN are Tramell links to single radio at Star Mt. The signal fades causing outages in the morning. It isn't likely to get better. The DYTN path is long but solid. Is long and has obstacles. We can either switch DYTN to a 900M link or GRBT to a cell modem. Mitch approved a cell modem. Late breaking update: GRBT is on a cell ruter as of Feb 2022 and the DYTN Tramell link has been much more reliable. Lesson learned: you can't put 10 lbs of sh*t in a 5 lb box.
The PC is no longer needed at STAR. Need to return it to CERI.
John will send the STAR SOH hardware to James to figure out how to send alarms. If this isn't in production soon, we're going to bail and get something off the shelf. The GX620's need to be retired. What is the status of this?
Move PMTN due to excessive noise and vandalism. The new site, CATN, is permitted and ready to install.
HPNC Node
Convert all HPNC stations to digital using Geobits and Trammel Links. DONE!
MTTN Node Move the atom to the host's rack and remove our rack.
PIGT comms are down. Bob submitted PO.
MACC and MAIR are not tracking satellites. Need a site visit. Both receivers replaced and tracking. MACC still needs it's WAN firewall disabled.
Nanometrics hardware for 4 remaining upgrades is on order. Shipping now estimated by end of February (apparent supply chain issues for cables of all things).
XBO3 has low power. There should be plenty of solar and battery so something else is wrong. Needs a site visit. Done.
The 120PA sensors at HHAR and FCAR are EOL. AG will fund about two replacements per year. We should try to get an additional two in DM funding. Won't happen until 2023.
WLAR is noisy. Horton is looking for a better site. WLAR is due a Centaur upgrade but we'd prefer to upgrade in the new location rather than the current one.
FCAR T120 has to go back to nanometrics. But the new T120 also has excessive long period drift. Both the datalogger and sensor have been ruled out. Jim will get a cable to swap it out. Could still be an issue with wiring and power. Cables are on backorder.
Vault for Z41A is in house. Needs to be installed. The cell connection is not very good at the current location. Should the vault be installed at a better location instead?
WHAR can be put back on the local network. Done.
Two new AG portables to be installed, AG.XA02 and AG.XB03. XA02 was installed at Annieville, AR and XB03 at Maynard, AR in November 2022. The WLAR and Batesville sites will get to other AGS portables for noise tests.
The FDL wiki is here: https://umwiki.memphis.edu/display/FDL/CERI+FDL
The seisnet group on umdrive is at http://umdrive.memphis.edu/mwithers/seisnet You will need your uuid and password.
The seisnet wiki is at https://umwiki.memphis.edu/display/CERITech/CERI+Tech You will need your uuid and password.