Tech Staff Meeting Notes November 6, 2018

The top priority is always repair of down stations.
NM problem stations
ET problem stations

Duty Table updated October 2017


Priorities


News & Highlights

Both Chris and Dave had other obligations which prevented their attendance at this meeting. We decided they can draw straws to see who will be digging up the sensors at BCRT.

There may be funds available next year for another round of Deferred Maintenance. Conversion of the NM network to digital is the obvious choice with Ogweno's EEW map as a guide for setting priorities. What other needs are there? Mitch needs a bulleted list by the end of the month--it need not be detailed.

NetOpsX will be March 5-6 at the University of Memphis.

USGS funding is in place for our three approved Deferred Maintenance items.

NC is reviewing the GFM agreement

There will be a GPS week rollover (max week count exceeds 1024) in April 2019. Some of our clocks may be affects. Dave Wilson at ASL is taking the lead to contact vendors for information on expected behavior.

Mitch asked Chris To delay his retirement to May, 2019 so assist with the ET conversion to digital.

SIS

SIS areas of responsibility


The Choctaw short-term plan is on schedule.

XP retirement. We are moving ahead with the Choctaw Short-term Plan. It is important stay on schedule. Phase I replaces the radios at DYTN. Phase II builds a new Raspberry Jam (RJ) prototype and upgrades TVNC2 to digital.

Phase I Schedule
Task Start Date Completion Date Staff Involved
GE MDS-ECR acquisition 9/18/18 10/30/18 Choctaw, Bollwerk
GE MDS-ECR familiarization and testing 10/30/18 11/13/18 Bollwerk, Steiner, Parker
GE MDS-ECR installation at DYTN 11/13/18 11/16/18 Parker, Steiner
Phase II Schedule
RS testing and tuning (especially timing and data handling) 9/15/18 9/30/18 Davis
Acquire RJ 9/30/18 10/8/18 Brewer
RJ prototype construction 10/8/18 10/31/18 Bollwerk, Steiner, Davis, VLF
RJ prototype testing 10/31/18 11/16/18 Davis, Bollwerk, Steiner
Infrastructure hardware acquisition 10/31/18 11/16/18 Bollwerk, Parker
Station build and burn-in 11/16/18 11/30/18 Steiner, Davis
Station Installation 12/3/18 12/7/18 Parker, McGoldrick, Bollwerk, Steiner
Node Installation 12/3/18 12/7/18 Parker, McGoldrick
Node reconfig 12/3/18 12/7/18 Davis, Brewer
Metadata Update 12/3/18 12/7/18 Davis, Withers
Station Certification 12/3/18 12/7/18 Withers, Davis


RTCC on Ubuntu 16 is able to get /parameters but fails with /status-control on loopback and RTPD hangs. It works in Ubuntu 18 but openvpn does not. Wait for that fix then leapfrog OS to 18.

NMSZ

NMSZ Routing service is just over half complete.

NMDown


Data taken from:
/dat1/seisadm/Working/NM/201811/20181101_165517_MAN

NM Down
SEAR
TWAR.EH*
TWAR.SC*
CWPT.EHN
CWPT.SCN
MCAR
MSAR.EHE
NHIN.EH*
NHIN.HN*

Misc Problems
EPRM - spikes
LRAR - "

AG Down
X502

There are 1 of 7 ISIS3 upgrades remaining (NHAR).

Make permanent repair receive mast for WYBT at HOPT install four 52 watt panel.

I40 Bridge comms.
Done. All channels are available on lawworm--need a web page for the helis.

Strongmotion stations NAIT, SEAR, and NHIN are having trouble moving up the priority list. of the three, SEAR is most valuable. NHIN is probably a fuse but can wait until there is a new obisidian to replace the 5TD.

NODE Tasks

DBB:

MKTA:

LNXT:

Adjust startup delay in transfer switch settings to give generator time to warm up.

NMAD:

AZTN/HDBR: Need to pull the 200' sensor at the weigh station. Probable water damage. There is no budget for this. Should we try to repair the sensor at MPHB and put it at HDAR2 (MPHB is over two decades old, possibly closer to three)? Should we turn off the HDAR2.*.20 channels until the sensor can be replaced?

CERI:
Server room power is unbalanced. Need to balance when three new AQMS machines are racked.


ETSZ

Replacement station for GTTN and RBNC needs a new plan. A cell modem would provide more options.

Need to remove antennas, coax, and any other hardware from the tower at Greentop. John and Chris will schedule a trip.

ETDown


Data taken from:
/dat1/seisadm/Working/ET/201811/20181102_111220_MAN

Down
BCRT.EH*
BCRT.HN*
CPRT.EH*
CPRT.HN*
DYTN.HN*

Misc Probems
CCNC - spikes (interference)
LRVA - "
VHTN - "
GFM - "
GMG.EHE
GMG.HNN

CPRT has many gaps though the telemetry is solid. This is Phase I of the Choctaw Short-term Plan

STAR Node

BCRT took a lighting hit. Needs new sensors and electrical ground upgrade.

Move PMTN due to excessive noise and vandalism. John has a site and sent a draft MOU to Mitch. The University did not ask for changes and asked for the WMA director to sign first, its currently in Nashville for approval. A portable was installed and shows no surprises, it should a good quiet site.

HPNC Node

MTTN Node


GPS

All GPS sites need PM visit.

There was a miscommunication with the Clifton site and internet access. Bob is looking at alternatives.

There was an internet "upgrade" at MACC. Need to reconfigure GPS networking configs; James may be able to do it remotely.


AG Network

Z41A has a leaky vault. It will need to be replaced with a CERI style vault.

HHAR needs a bigger solar regulator. The new one should last a year.


FDL

The FDL wiki is here: https://umwiki.memphis.edu/display/FDL/CERI+FDL


MISCELLANEOUS

The seisnet group on umdrive is at http://umdrive.memphis.edu/mwithers/seisnet You will need your uuid and password.

The seisnet wiki is at https://umwiki.memphis.edu/display/CERITech/CERI+Tech You will need your uuid and password.