Tech Staff Meeting Notes October 2, 2018
The top priority is always repair of down stations.
NM problem stations
ET problem stations
Duty Table updated October 2017
HazMat inventory is due. Dave volunteered to take over from Chris.
NetOpsX will be March 5-6 at the University of Memphis.
USGS funding is in place for our three approved Deferred Maintenance items.
NC is reviewing the GFM agreement
There will be a GPS week rollover (max week count exceeds 1024) in April 2019. Some of our clocks may be affects. Dave Wilson at ASL is taking the lead to contact vendors for information on expected behavior.
Chris announced his retirement for the end of December 2018. Or maybe February, 2019.
SIS areas of responsibility
XP retirement. We are moving ahead with the Choctaw Short-term Plan. It is important stay on schedule. Phase I replaces the radios at DYTN. Phase II builds a new Raspberry Jam (RJ) prototype and upgrades TVNC2 to digital.
Phase I Schedule | |||
Task | Start Date | Completion Date | Staff Involved |
GE MDS-ECR acquisition | 9/18/18 | 10/30/18 | Choctaw, Bollwerk |
GE MDS-ECR familiarization and testing | 10/30/18 | 11/13/18 | Bollwerk, Steiner, Parker |
GE MDS-ECR installation at DYTN | 11/13/18 | 11/16/18 | Parker, Steiner |
Phase II Schedule | |||
RS testing and tuning (especially timing and data handling) | 9/15/18 | 9/30/18 | Davis |
Acquire RJ | 9/30/18 | 10/8/18 | Brewer |
RJ prototype construction | 10/8/18 | 10/31/18 | Bollwerk, Steiner, Davis, VLF |
RJ prototype testing | 10/31/18 | 11/16/18 | Davis, Bollwerk, Steiner |
Infrastructure hardware acquisition | 10/31/18 | 11/16/18 | Bollwerk, Parker |
Station build and burn-in | 11/16/18 | 11/30/18 | Steiner, Davis |
Station Installation | 12/3/18 | 12/7/18 | Parker, McGoldrick, Bollwerk, Steiner |
Node Installation | 12/3/18 | 12/7/18 | Parker, McGoldrick |
Node reconfig | 12/3/18 | 12/7/18 | Davis, Brewer |
Metadata Update | 12/3/18 | 12/7/18 | Davis, Withers |
Station Certification | 12/3/18 | 12/7/18 | Withers, Davis |
RTCC on Ubuntu 16 is able to get /parameters but fails with /status-control on loopback and RTPD hangs. It works in Ubuntu 18 but openvpn does not. Wait for that fix then leapfrog OS to 18.
List from last month; Holly is out sick
NMDown
Data taken from:
/dat1/seisadm/Working/NM/201809/20180904_030926_MAN
/dat1/seisadm/Working/NM/201809/20180901_010755_MAN
/dat1/seisadm/Working/NM/201808/20180831_143826_MAN
NM Down
CHRM
DWDM
BRNM.EHN
Misc Problems
BETM - spikes
CWPT - "
EPRM - "
FPST - "
RELT - "
MSAR - see image
TWAR - see image
AG Down
LCAR.HH*
LCAR.HN*
There are 1 of 7 ISIS3 upgrades remaining (NHAR).
Make permanent repair receive mast for WYBT at HOPT install four 52 watt panel.
I40 Bridge comms.
Radios are installed and transmitting same limited channels as before to
lawworm. Need to reconfigure DAS's to send all channels at 200sps to lawworm
and need to reconfigure lawworm to accept them. NSMP will have access to the
ringserver on lawworm.
The I40 DAS compact flash (CF) cards are a known point of failure in the Granites (2 of 7 have failed so far). We will purchase and configure 5 more and install at the same time as the radio. HD4 with its new CF will also be installed at that time.
Strongmotion stations NAIT, SEAR, and NHIN are having trouble moving up the priority list. of the three, SEAR is most valuable. NHIN is probably a fuse but can wait until there is a new obisidian to replace the 5TD.
DBB:
MKTA:
LNXT:
Adjust startup delay in transfer switch settings to give generator time to warm up.
NMAD:
AZTN/HDBR: Need to pull the 200' sensor at the weigh station. Probable water damage. There is no budget for this. Should we try to repair the sensor at MPHB and put it at HDAR2 (MPHB is over two decades old, possibly closer to three)? Should we turn off the HDAR2.*.20 channels until the sensor can be replaced?
CERI:
Server room power is unbalanced. Need to balance when three new AQMS machines
are racked.
Replacement station for GTTN and RBNC needs a new plan. A cell modem would provide more options.
Need to remove antennas, coax, and any other hardware from the tower at
Greentop. John and Chris will schedule a trip.
ETDown
List from last month; Holly is out sick
Data taken from:
/dat1/seisadm/Working/ET/201809/20180902_091640_MAN
Down
BCRT.EH*
BCRT.HN*
CMGA
DYTN.HN*
GMG.EHE
Misc Problems
CPRT.EH* - gaps
CPRT.HN* - "
GMG.HNN - see image
CPRT has many gaps though the telemetry is solid. This is Phase I of the Choctaw Short-term Plan
STAR Node
BCRT took a lighting hit. Needs new sensors and electrical ground upgrade.
Move PMTN due to excessive noise and vandalism. John has a site and sent a draft MOU to Mitch. The University did not ask for changes and asked for the WMA director to sign first, its currently in Nashville for approval. A portable was installed and shows no surprises, it should a good quiet site.
HPNC Node
MTTN Node
All GPS sites need PM visit.
There was a miscommunication with the Clifton site and internet access. Bob is looking at alternatives.
New radios are ready for installation at PTGV.
There was an internet "upgrade" at MACC. Need to reconfigure GPS networking configs; James may be able to do it remotely.
Z41A has a leaky vault. It will need to be replaced with a CERI style vault.
HHAR needs a bigger solar regulator. The new one should last a year.
We are cautiously optimistic that the LCAR issue may have been resolved with a letter from the PI.
The FDL wiki is here: https://umwiki.memphis.edu/display/FDL/CERI+FDL
The seisnet group on umdrive is at http://umdrive.memphis.edu/mwithers/seisnet You will need your uuid and password.
The seisnet wiki is at https://umwiki.memphis.edu/display/CERITech/CERI+Tech You will need your uuid and password.