Tech Staff Meeting Notes October 2, 2018

The top priority is always repair of down stations.
NM problem stations
ET problem stations

Duty Table updated October 2017


Priorities


News & Highlights

HazMat inventory is due. Dave volunteered to take over from Chris.

NetOpsX will be March 5-6 at the University of Memphis.

USGS funding is in place for our three approved Deferred Maintenance items.

NC is reviewing the GFM agreement

There will be a GPS week rollover (max week count exceeds 1024) in April 2019. Some of our clocks may be affects. Dave Wilson at ASL is taking the lead to contact vendors for information on expected behavior.

Chris announced his retirement for the end of December 2018. Or maybe February, 2019.

SIS

SIS areas of responsibility


XP retirement. We are moving ahead with the Choctaw Short-term Plan. It is important stay on schedule. Phase I replaces the radios at DYTN. Phase II builds a new Raspberry Jam (RJ) prototype and upgrades TVNC2 to digital.

Phase I Schedule
Task Start Date Completion Date Staff Involved
GE MDS-ECR acquisition 9/18/18 10/30/18 Choctaw, Bollwerk
GE MDS-ECR familiarization and testing 10/30/18 11/13/18 Bollwerk, Steiner, Parker
GE MDS-ECR installation at DYTN 11/13/18 11/16/18 Parker, Steiner
Phase II Schedule
RS testing and tuning (especially timing and data handling) 9/15/18 9/30/18 Davis
Acquire RJ 9/30/18 10/8/18 Brewer
RJ prototype construction 10/8/18 10/31/18 Bollwerk, Steiner, Davis, VLF
RJ prototype testing 10/31/18 11/16/18 Davis, Bollwerk, Steiner
Infrastructure hardware acquisition 10/31/18 11/16/18 Bollwerk, Parker
Station build and burn-in 11/16/18 11/30/18 Steiner, Davis
Station Installation 12/3/18 12/7/18 Parker, McGoldrick, Bollwerk, Steiner
Node Installation 12/3/18 12/7/18 Parker, McGoldrick
Node reconfig 12/3/18 12/7/18 Davis, Brewer
Metadata Update 12/3/18 12/7/18 Davis, Withers
Station Certification 12/3/18 12/7/18 Withers, Davis

RTCC on Ubuntu 16 is able to get /parameters but fails with /status-control on loopback and RTPD hangs. It works in Ubuntu 18 but openvpn does not. Wait for that fix then leapfrog OS to 18.

NMSZ

List from last month; Holly is out sick

NMDown


Data taken from:
/dat1/seisadm/Working/NM/201809/20180904_030926_MAN
/dat1/seisadm/Working/NM/201809/20180901_010755_MAN
/dat1/seisadm/Working/NM/201808/20180831_143826_MAN

NM Down
CHRM
DWDM
BRNM.EHN

Misc Problems
BETM - spikes
CWPT - "
EPRM - "
FPST - "
RELT - "
MSAR - see image
TWAR - see image

AG Down
LCAR.HH*
LCAR.HN*

There are 1 of 7 ISIS3 upgrades remaining (NHAR).

Make permanent repair receive mast for WYBT at HOPT install four 52 watt panel.

I40 Bridge comms.
Radios are installed and transmitting same limited channels as before to lawworm. Need to reconfigure DAS's to send all channels at 200sps to lawworm and need to reconfigure lawworm to accept them. NSMP will have access to the ringserver on lawworm.

The I40 DAS compact flash (CF) cards are a known point of failure in the Granites (2 of 7 have failed so far). We will purchase and configure 5 more and install at the same time as the radio. HD4 with its new CF will also be installed at that time.

Strongmotion stations NAIT, SEAR, and NHIN are having trouble moving up the priority list. of the three, SEAR is most valuable. NHIN is probably a fuse but can wait until there is a new obisidian to replace the 5TD.

NODE Tasks

DBB:

MKTA:

LNXT:

Adjust startup delay in transfer switch settings to give generator time to warm up.

NMAD:

AZTN/HDBR: Need to pull the 200' sensor at the weigh station. Probable water damage. There is no budget for this. Should we try to repair the sensor at MPHB and put it at HDAR2 (MPHB is over two decades old, possibly closer to three)? Should we turn off the HDAR2.*.20 channels until the sensor can be replaced?

CERI:
Server room power is unbalanced. Need to balance when three new AQMS machines are racked.


ETSZ

Replacement station for GTTN and RBNC needs a new plan. A cell modem would provide more options.

Need to remove antennas, coax, and any other hardware from the tower at Greentop. John and Chris will schedule a trip.

ETDown


List from last month; Holly is out sick
Data taken from:
/dat1/seisadm/Working/ET/201809/20180902_091640_MAN

Down
BCRT.EH*
BCRT.HN*
CMGA
DYTN.HN*
GMG.EHE

Misc Problems
CPRT.EH* - gaps
CPRT.HN* - "
GMG.HNN - see image

CPRT has many gaps though the telemetry is solid. This is Phase I of the Choctaw Short-term Plan

STAR Node

BCRT took a lighting hit. Needs new sensors and electrical ground upgrade.

Move PMTN due to excessive noise and vandalism. John has a site and sent a draft MOU to Mitch. The University did not ask for changes and asked for the WMA director to sign first, its currently in Nashville for approval. A portable was installed and shows no surprises, it should a good quiet site.

HPNC Node

MTTN Node


GPS

All GPS sites need PM visit.

There was a miscommunication with the Clifton site and internet access. Bob is looking at alternatives.

New radios are ready for installation at PTGV.

There was an internet "upgrade" at MACC. Need to reconfigure GPS networking configs; James may be able to do it remotely.


AG Network

Z41A has a leaky vault. It will need to be replaced with a CERI style vault.

HHAR needs a bigger solar regulator. The new one should last a year.

We are cautiously optimistic that the LCAR issue may have been resolved with a letter from the PI.


FDL

The FDL wiki is here: https://umwiki.memphis.edu/display/FDL/CERI+FDL


MISCELLANEOUS

The seisnet group on umdrive is at http://umdrive.memphis.edu/mwithers/seisnet You will need your uuid and password.

The seisnet wiki is at https://umwiki.memphis.edu/display/CERITech/CERI+Tech You will need your uuid and password.