ANSS NetOps Workshop

ANSS NetOps Workshop
February 6 and 7, 2006
Salt Lake City Marriott, University Park


Background Materials



The TIC reports were written by working groups of the ANSS Technical Integration Committee. They describe a fully funded ANSS and it is understood that current resources do not exist to meet many of the standards. It is however, a goal to strive for.

National Performance Standards

NEIC/CISN Integration

Instrumentation, Siting, Installation, and Site Metadata
From the authors:
This document is a draft revision of Chapters 3 and 4 of USGS Open-File Report 02-92 entitled Technical Guidelines for the Implementation of the Advanced National Seismic System--Version 1.0. The revisions so far have concentrated on better stating the data needs of ANSS as they relate to types of monitoring stations (discussed in Section 3.2) and updating the quantitative characteristics of station elements including sensors, data acquisition units, power supplies, and packaging (discussed in Section 3.4 Functional Specifications) as necessary to satisfy the data needs. The full original text is available at .

Evolutionary System Architecture

Circular 1188

Other Key ANSS Documents

ANSS web pages

USGS Earthquake Hazards Program